| Top rated |
|
|

Spotted when fueling at Dysarts (Bangor, ME)132 viewsBuzzard Wing (1 votes)
|
|
|

Making a plan for the angle plow86 viewsBuzzard Wing (1 votes)
|
|
|
|
|

39 viewsMr E (1 votes)
|
|
|

int154 subframe71 viewsI used the C Channel on both side of the frame and them boxed the front so there connected with a solid fabrication. I also noticed that the welds were missing over the front axle support to the vertical plate connecting the two frames together R&L. BigBill (1 votes)
|
|

154 FEL subframe66 viewsHere's my design just off the top of my head. I'm just flying with an idea on how the structural should be fabricated.BigBill (1 votes)
|
|

int154 FEL225 viewsHere we go its the beginning of something great. Every part will be made by me except for the hydraulics. I left the drivetrain in the rolling frame so i know everything will clear on the final assembly. Measure twice cut/weld once.
Remember what my professor(PHD) taugh me the strength is in the vertical.BigBill (1 votes)
|
|
|

38 viewsMr E (1 votes)
|
|

37 viewsMr E (1 votes)
|
|
|
|
|
|
|
|
|
| 10837 files on 542 page(s) |
 |
 |
 |
 |
 |
 |
 |
292 |  |
 |
 |
 |
 |
|